top of page
安装图_画板 1.png

Metal Cut Letter

Mounting Material

Wall

图标_画板 1.png

Electric drill

图标_画板 1 副本 3.png

Measuring tape

图标_画板 1 副本.png

Silicone glue

图标_画板 1 副本 5.png

Screwdriver

图标_画板 1 副本 4.png

Marker

图标_画板 1 副本 2.png

Level

1 线稿图_画板 1 副本.png

Put the screw rod into the fixing hole on logo back

1 线稿图_画板 1 副本 2.png

The size ofthe fixing hole needsto be 2mm largerthan thediameter of the screw rod

1 线稿图_画板 1 副本 3.png

Apply silicone evenly to the logoback surface and the screw rodsurface

1 线稿图_画板 1 副本 4.png

Insert the logo into the fixing hole

INSTALLATION DETAILS

1 线稿图_画板 1 副本 5.png

Screw pin on the back of the letters

1 线稿图_画板 1 副本 6.png

Put the spacer into the screw rod

1 线稿图_画板 1 副本 7.png

Stick the template on the wall and check theposition with level. Mark the holes on the template

1 线稿图_画板 1 副本 8.png

Remove the template , drill the holesand clean the wall

1 线稿图_画板 1 副本 9.png

Put the screw rod into the fixing hole on logo back

Detailed Steps 2-6.png

Press the letters into the holes andcheck the position with level

Detailed Steps 2-7.png

Tape across the face of the letterswith painters tape to hold in place

Detailed Steps 2-8.png

Remove the painter tape and finishtheinstalation

+86 18020206652

No. 1 Fenyang Rd., 

Wujiang, Suzhou, Jiangsu, China

2020 © sunsignad Adverting. All Rights Reserved.

bottom of page